HOME ABOUT US SERVICES STAFF PROJECTS CONTACT US AWARDS

 

 

El Centro Projects

 

Palm Desert Projects

Schools

Municipal

Commercial

Residential

Military - Federal

Specialty

Dillon Wind Farm

Blessed Teresa of Calcuta Catholic Parish

Quan Am Statue @ Chan Nguyen

Photovoltaic Array Design @ Seley Ranch

Soboba New Hotel & Casino

 

 

  Photovoltaic Array Design/Build @ Seley Ranch

   Borrego Springs, CA

The project occupies approximately 1 acre of land and required the installation of 1,700 solar panels and associated electrical equipment. It is the largest solar power system in San Diego County and the largest solar driven pump system in the world.

 

 

The project required the installation of a 267 KW photovoltaic ground-mounted array to provide power to a variable frequency drive capable of running a 200-horsepower irrigation water pump.  

 

 

LandMark Consultants, Inc. is the geotechnical of record for this project. We are provided geotechnical design parameters and investigation for the proposed project in 2004 for Blymyer Engineers Inc.

     

Copyright © 2008 LandMark Consultants, Inc.